{"id":16651,"date":"2014-02-06T15:59:50","date_gmt":"2014-02-06T13:59:50","guid":{"rendered":"https:\/\/joblistsouthafrica.com\/?p=16651"},"modified":"2014-02-06T15:59:50","modified_gmt":"2014-02-06T13:59:50","slug":"construction-manager-vacancy","status":"publish","type":"post","link":"https:\/\/joblistsouthafrica.com\/construction-manager-vacancy.html","title":{"rendered":"Construction Manager Vacancy"},"content":{"rendered":"
Job No.:\u00a0906251
\nDepartment:\u00a0Power Systems
\nWork type:\u00a0Fixed Term
\nLocation:\u00a0Port Elizabeth<\/p>\n
Construction Manager (CNM) – Power Systems\/Power Generation project experience is crucial<\/p>\n
The CNM reports functionally to the SM, has the authority over all the construction people<\/p>\n
and principally co-ordinates all the Site activities interfacing the Discipline Managers.<\/p>\n
<\/p>\n
The responsibilities of the CNM are as follows:<\/strong><\/p>\n To update and develop the Construction Schedules in detail, optimizing sequences and limiting any overlapping; <\/p>\n
\nTo co-operate with the SPL in preparing or revising detailed construction schedules and defining priorities;
\nTo participate in the definition for the construction strategy and construction procedures (e.g. Method Statements);
\nTo implement and ensure the correct fulfillment of the Site safety program, including subcontractors’ activities;
\nTo ensure that all Site personnel are aware of the specified quality standards;
\nTo ensure that field requirements for staff and labor, equipment, tools and construction facilities are compatible with the overall plant schedule;
\nTo enforce implementation of the construction plan and procedures (e.g. Method Statements) on the job Site;
\nTo ensure that the plant is constructed in accordance with approved drawings, specifications and local regulations;
\nTo organize split and delegation of responsibilities between the field supervision staff and ensure a clear understanding of each function;
\nTo control construction progress and establish clearly defined actions and responsibilities and time-frame for their implementation to fulfill with construction schedule requirement;
\nTo report any Non-Conformance (NC) to the SM and to the SQM;
\nMechanical Completion control and reporting; together with the CM , to ensure congruence between the completion of Construction and Plant Commissioning;
\nTo ensure that Mechanical Completion punch list items are satisfactorily closed;
\nPrepare his\/her own section of the MPR.<\/p>\n